Soldering pipes for the installation of the heat pump
-
Work on Amadeo II facade with Henkel Ceresit silicone/silicate
-
Installation of galvanised iron sheets on the junction of the roof
-
Structural work on Amadeo II is finished
-
Applying Bitum Multigum as the waterproofing layer
-
Working on the roof of Amadeo II
-
Amadeo II in HDR
-
Making the other part of the 2nd floor slab of Amadeo II
-
Making the other part of the 2nd floor slab of Amadeo II
-
Two floors of Amadeo II
-
Making the one part of the 2nd floor slab of Amadeo II
-
Raising wall with Klimabloc 25
-
Detail of AVI Thermokorb (thermal break for balcony)
-
Pouring concrete on Amadeo II ground floor
-
Pouring concrete on Amadeo II ground floor
-
Pouring concrete on Amadeo II base slab
-
Operating Marmil concrete pump
-
Last checking of the parking walls cast before pouring concrete
-
Filling parking walls cast with concrete
-
Joining hydro-insulation of the wall with the one from the slab
-
Installing hydro-insulation on the connective wall
-
Fastening reinforcement on Amadeo II parking walls